RECONSTRUCTION OF NATIONAL ROAD NO. 35 AT THE SECTION WAŁBRZYCH – ŚWIEBODZICE

Full name: Reconstruction of National Road No. 35 at the section of Wałbrzych – Świebodzice

Investor:  General Directorate of National Roads and Motorways in Wrocław

Date: September 2004 – May 2005

Task description: Documentation covered construction-executive project for the renovation of national road of G class at the section from 30+500 km to the junction with national road no. 34 in Świebodzice. Length of the renovated section amounts to 1218 m. The main objective of the elaborated documentation was renovation and strengthening of the existing roadway together with construction of separation strip.

Industries/Scope: roads, dewatering, organization of target traffic, organization of substitution traffic

Map: Świebodzice, Lower Silesian Voivodeship