Wrocławskie Biuro Projektów - DROSYSTEM Sp. z o.o.

CONSTRUCTION OF THE VOIVODESHIP ROAD FROM A4 BIELANY WROCŁAWSKIE JUNCTION (KARKONOSKA ST.) TO VOIVODESHIP ROAD NO. 395 (ŻERNIKI WROCŁAWSKIE ROUNDABOUT) AND TO WROCLAW BORDER

CONSTRUCTION OF THE VOIVODESHIP ROAD FROM A4 BIELANY WROCŁAWSKIE JUNCTION (KARKONOSKA ST.) TO VOIVODESHIP ROAD NO. 395 (ŻERNIKI WROCŁAWSKIE ROUNDABOUT) AND TO WROCLAW BORDER

Investor/Contracting authority: Lower Silesian Roads and Rail Service in Wroclaw Project description: The subject of the development is the concept of the course of the Voivodeship Road Bielany-Łany-Długołęka – stage II, within the section from A4 Bielany Wrocławskie Junction (Karkonoska St.) to Voivodeship Road No. 395 (Żerniki Wroclawskie Roundabout) and to the city border (Buforowa St.). TheRead more about CONSTRUCTION OF THE VOIVODESHIP ROAD FROM A4 BIELANY WROCŁAWSKIE JUNCTION (KARKONOSKA ST.) TO VOIVODESHIP ROAD NO. 395 (ŻERNIKI WROCŁAWSKIE ROUNDABOUT) AND TO WROCLAW BORDER[…]

RECONSTRUCTION/EXTENSION OF SZCZECIŃSKA ST. WITHIN THE SECTION FROM ALEKSANDROWSKA ST. TO THE AREA OF PANCERNIAKÓW ST.

RECONSTRUCTION/EXTENSION OF SZCZECIŃSKA ST. WITHIN THE SECTION FROM ALEKSANDROWSKA ST. TO THE AREA OF PANCERNIAKÓW ST.

Investor/Contracting authority: Łódź – Road Transport Management Date of development: May 2015 – now Project description: The subject of the contract is the development of design documentation concerning the reconstruction of Szczecińska Street at a length of about 3 200 m to communicate the S 14 road to the city centre. The project includes a complete set ofRead more about RECONSTRUCTION/EXTENSION OF SZCZECIŃSKA ST. WITHIN THE SECTION FROM ALEKSANDROWSKA ST. TO THE AREA OF PANCERNIAKÓW ST.[…]

CONSTRUCTION OF COMMUNICATION ROUTE NEW KIELNIŃSKA – NEW SPACER – GREEN BULWAR IN GDAŃSK

CONSTRUCTION OF COMMUNICATION ROUTE NEW KIELNIŃSKA – NEW SPACER – GREEN BULWAR IN GDAŃSK

Investor/Ordering authority: Directorate for City Development of Gdańsk, ul. Żaglowa 11, 80-560 Gdansk, acting on behalf of the Commune of the City of Gdańsk Development date: December 2016 – present Industries/Range: Update of the variant and indication of the implementation variant, based on the studies indicated above; Preparation of the Investment Information Sheet together with annexes toRead more about CONSTRUCTION OF COMMUNICATION ROUTE NEW KIELNIŃSKA – NEW SPACER – GREEN BULWAR IN GDAŃSK[…]

RECONSTRUCTION OF NATIONAL ROAD No. 9 AND 12 IN RADOM – WOJSKA POLSKIEGO STREET AND ŻÓŁKIEWSKI STREET FROM ZBROWSKI STREET TO KOZIENIECKIE STREET WITH THE RECONSTRUCTION OF ZWOLIŃSKI STREET

RECONSTRUCTION OF NATIONAL ROAD No. 9 AND 12 IN RADOM – WOJSKA POLSKIEGO STREET AND ŻÓŁKIEWSKI STREET FROM ZBROWSKI STREET TO KOZIENIECKIE STREET WITH THE RECONSTRUCTION OF ZWOLIŃSKI STREET

Investor/Ordering authority: Municipal Road and Traffic Management with its registered office in Radom Development date: July 2016 – December 2020 Task description: The subject of the contract is to develop documentation for the task called Reconstruction of National Roads No. 9 and 12 in Radom – Wojska Polskiego Street and Żółkiewski Street along the section from Zbrowski StreetRead more about RECONSTRUCTION OF NATIONAL ROAD No. 9 AND 12 IN RADOM – WOJSKA POLSKIEGO STREET AND ŻÓŁKIEWSKI STREET FROM ZBROWSKI STREET TO KOZIENIECKIE STREET WITH THE RECONSTRUCTION OF ZWOLIŃSKI STREET[…]

IMPLEMENTATION OF PROJECT DOCUMENTATION OF EXPANSION OF THE PROVINCIAL ROAD NO. 158

IMPLEMENTATION OF PROJECT DOCUMENTATION OF EXPANSION OF THE PROVINCIAL ROAD NO. 158

Execution of the project documentation for the extension of the provincial road No. 158 of the section in km 17+800,00 ÷21+849,58 and the reconstruction of sections in km 21+840,58÷ 22+100,00 and in km 29+115,00 ÷31+435,00 Investor/Ordering authority: Provincial Roads Administration in Zielona Góra Development date: August 2015 – present Task description: The subject of the contract is theRead more about IMPLEMENTATION OF PROJECT DOCUMENTATION OF EXPANSION OF THE PROVINCIAL ROAD NO. 158[…]

DEVELOPMENT OF THE PROJECT DOCUMENTATION OF THE RECONSTRUCTION OF THE PRVINCIAL ROAD NO. 910

DEVELOPMENT OF THE PROJECT DOCUMENTATION OF THE RECONSTRUCTION OF THE PRVINCIAL ROAD NO. 910

Development of the PROJECT documentation of the reconstruction of the provincial road No. 910, section from DK 86 to Dąbrowa Górnicza. Investor/Ordering authority: Provincial Roads Administration in Katowice Development date: September 2015 – June 2017 Task description: The subject of the contract is the development of the project documentation of the reconstruction of the provincial road No.Read more about DEVELOPMENT OF THE PROJECT DOCUMENTATION OF THE RECONSTRUCTION OF THE PRVINCIAL ROAD NO. 910[…]

DEVELOPING PROJECT DOCUMENTATION FOR THE RECONSTRUCTION  OF THE PROVINCIAL ROAD NO. 935

DEVELOPING PROJECT DOCUMENTATION FOR THE RECONSTRUCTION OF THE PROVINCIAL ROAD NO. 935

Katowice-dw-935 Development of project documentation for the reconstruction of the provincial road no. 935 running through Racibórz district and Wodzisław district. Investor/Ordering authority: Provincial Roads Administration in Katowice Development date: September 2015 – November 2018 Task description: The subject of the contract is the development of the project documentation for the task of reconstruction of the provincial roadRead more about DEVELOPING PROJECT DOCUMENTATION FOR THE RECONSTRUCTION OF THE PROVINCIAL ROAD NO. 935[…]

EXPANSION OF THE PROVINCIAL ROAD NO. 163 AT THE SECTION ALONG KOŁOBRZEG-BIAŁOGARD

EXPANSION OF THE PROVINCIAL ROAD NO. 163 AT THE SECTION ALONG KOŁOBRZEG-BIAŁOGARD

Investor/Ordering authority: West Pomeranian Provincial Roads Administration in Koszalin Development date: May 2016 – present Task description: The subject of the contract is to develop documentation for the task called extension of provincial road no. 163 on the Kołobrzeg-Białogard section of about 30.4 km. Communication of the provincial road to the newly designed S6 route. The content ofRead more about EXPANSION OF THE PROVINCIAL ROAD NO. 163 AT THE SECTION ALONG KOŁOBRZEG-BIAŁOGARD[…]

BUILDING OF RECREATION AND TOURIST ROUTE OF WOŁÓW – LUBIĄŻ

BUILDING OF RECREATION AND TOURIST ROUTE OF WOŁÓW – LUBIĄŻ

Full name: Construction of cycle paths along the route of the former narrow-gauge railway in the districts of Tarnobin and Milicz Investor: Oborniki Śląskie Commune Date: October 2013 – 16, June 2015 Task description: The object of the contract is to provide a service consisting of the development of a concept and a construction project together with obtaining aRead more about BUILDING OF RECREATION AND TOURIST ROUTE OF WOŁÓW – LUBIĄŻ[…]

CONSTRUCTION OF CYCLE ROUTES IN ŚLĄSKIE

CONSTRUCTION OF CYCLE ROUTES IN ŚLĄSKIE

Full name: Construction of cycle paths along the route of the former narrow-gauge railway in the districts of Tarnobin and Milicz Investor: Oborniki Śląskie Commune Date: October 2013 – 16, June 2015 Task description: The object of the contract is to provide a service consisting of the development of a concept and a construction project together with obtaining aRead more about CONSTRUCTION OF CYCLE ROUTES IN ŚLĄSKIE[…]

CONSTRUCTION OF BICYCLE ROUTS ALONG WTHE NARROW-GAUGE RAILWAY IN MILICKA AND TRZEBNICKA DISTRICT

CONSTRUCTION OF BICYCLE ROUTS ALONG WTHE NARROW-GAUGE RAILWAY IN MILICKA AND TRZEBNICKA DISTRICT

Investor/Purchaser: Trzebnicki District, Milicki, Prusice Commune, Trzebnica, Żmigród, Oborniki Śląskie Development date: June 2012 – March 2015 Task description: The documentation included the development of a construction and executive project for the construction of around 100 km of bicycle paths in two districts Industries/Range: -maps for design purposes, -projects of 150 km long bicycle paths -road construction projectRead more about CONSTRUCTION OF BICYCLE ROUTS ALONG WTHE NARROW-GAUGE RAILWAY IN MILICKA AND TRZEBNICKA DISTRICT[…]

RECONSTRUCTION OF THE RUDZKA STREET FROM OBWIEDNIA PÓŁNOCNA TO THE BORDER OF THE CITY WITH THE BRIDGE

RECONSTRUCTION OF THE RUDZKA STREET FROM OBWIEDNIA PÓŁNOCNA TO THE BORDER OF THE CITY WITH THE BRIDGE

Investor/Purchaser: Rybnik Development date: July 2011 – January 2015 Task description: The documentation covers the development of a DW-920 construction and executive design. The entire project was divided into seven stages. Industries/Range: -G class roads 8.5 km long -bridge over the river Nacyna -rain drainage network -water supply network -lightning -power grid -teletechnical network -environmental impact report withRead more about RECONSTRUCTION OF THE RUDZKA STREET FROM OBWIEDNIA PÓŁNOCNA TO THE BORDER OF THE CITY WITH THE BRIDGE[…]

EXPANSION OF THE VOIVODSHIP ROUTE No. 901 IN BZINICA STARA

EXPANSION OF THE VOIVODSHIP ROUTE No. 901 IN BZINICA STARA

Full name: Development of the project for: extension of provincial road No. 901 in Bzinica Stara from km 21 + 560 to km 22 + 960 Investor: Provincial Roads Administration in Opole Date: March 2010 – November 2011 Task description: The documentation included the development of a 1.4 km long G-class road construction project and a decision on environmentalRead more about EXPANSION OF THE VOIVODSHIP ROUTE No. 901 IN BZINICA STARA[…]

EXPANSION OF National Road no. 94 AT THE SECTION KRZYWA-CHOJNÓW

EXPANSION OF National Road no. 94 AT THE SECTION KRZYWA-CHOJNÓW

Full name: Expansion project of national road no. 94 at the section Krzywa-Chojnów togethr with reconstruction of engineering objects Investor: General Directorate of National Roads and Motorways in Wrocław Date: November 2005-December 2008 Task description: Biuro Projektowo – Konsultingowe BPK Mosty S.C., BIPROGEO – PROJEKT Sp. z o.o. Task description: Documentation encompassed elaboration of construction-executive project of expansion ofRead more about EXPANSION OF National Road no. 94 AT THE SECTION KRZYWA-CHOJNÓW[…]

RENOVATION OF SOUTHERN LANE OF A4 MOTORWAY

RENOVATION OF SOUTHERN LANE OF A4 MOTORWAY

Full name: Elaboration of project documentation for renovation of southern lane of A4 motorway from 153+864 km to 167+274 km together with conduct of repair works Investor: MOTA-ENGIL CENTRAL EUROPE S.A.  Date: June 2014 – July 2014 Task description: Documentation covered elaboration of construction-execution project of renovation of A class road with a length of 13,41 km Industries/Scope: road industryRead more about RENOVATION OF SOUTHERN LANE OF A4 MOTORWAY[…]

RENOVATION OF PRZYJAŹNI STREET IN WROCŁAW

RENOVATION OF PRZYJAŹNI STREET IN WROCŁAW

Full name: Renovation of Przyjaźni Street in Wrocław Investor: Bickhardt Bau Polska Sp. z o.o. Date: June 2013-December 2013 Task description: Documentation covered elaboration of construction and execution project of renovation of Z class road with a length of 1,2 km. Industries/Scope: maps for project purposes, project of road industry together with technology of construction reinforcing, project of storm waterRead more about RENOVATION OF PRZYJAŹNI STREET IN WROCŁAW[…]

RECONSTRUCTION OF KOSTRZYŃSKA STREET IN GORZÓW WIELKOPOLSKI

RECONSTRUCTION OF KOSTRZYŃSKA STREET IN GORZÓW WIELKOPOLSKI

Full name: Reconstruction of Kostrzyńska Street Investor: Gorzów Wielkopolski – City Hall Date: June 2014 – now Project description: The aim of the contract is the development of design documentation concerning the reconstruction of Kostrzyńska Street within the section of about 1,900 m – from Słoneczny Square to the Junction with Dobra Street in Gorzów Wielkopolski. More about ReconstructionRead more about RECONSTRUCTION OF KOSTRZYŃSKA STREET IN GORZÓW WIELKOPOLSKI[…]

RECONSTRUCTION OF ZAMKOWA STREET IN WROCLAW

RECONSTRUCTION OF ZAMKOWA STREET IN WROCLAW

Full name: Reconstruction of Zamkowa Street from Kazimierza Wielkiego Street to H. Modrzejewskiej Street in Wrocław Investor: PRO-TRA BUILDING Sp. z o.o. /Wrocław Municipality – Wrocławskie Inwestycje sp. z o.o. Date: March 2014-30 June 2016 Task description: Elaboration of construction project, executive designs and other elaborations necessary for conduct of reconstruction of street with obtaining all arrangements and decisionsRead more about RECONSTRUCTION OF ZAMKOWA STREET IN WROCLAW[…]

RECONSTRUCTION OF NATIONAL ROAD NO. 35 AT THE SECTION WAŁBRZYCH – ŚWIEBODZICE

RECONSTRUCTION OF NATIONAL ROAD NO. 35 AT THE SECTION WAŁBRZYCH – ŚWIEBODZICE

Full name: Reconstruction of National Road No. 35 at the section of Wałbrzych – Świebodzice Investor:  General Directorate of National Roads and Motorways in Wrocław Date: September 2004 – May 2005 Task description: Documentation covered construction-executive project for the renovation of national road of G class at the section from 30+500 km to the junction with national road no. 34Read more about RECONSTRUCTION OF NATIONAL ROAD NO. 35 AT THE SECTION WAŁBRZYCH – ŚWIEBODZICE[…]

RECONSTRUCTION OF NATIONAL ROAD No. 5 IN PONIN

RECONSTRUCTION OF NATIONAL ROAD No. 5 IN PONIN

Full name: Project of reconstruction of national road no. 5 in Ponin at the section from 236+170 km to 237+315 km Investor: General Directorate of National Roads and Motorways in Poznań Date: June 2007-April 2008 Task description: Documentation covered elaboration of construction-executive project of reconstruction of national road of GP class with a length of 1,145 km. Industries/Scope: roads, organizationRead more about RECONSTRUCTION OF NATIONAL ROAD No. 5 IN PONIN[…]

CONNECTION OF WILCZYŃSKIEGO STREET AND PŁOSKIEGO STREET WITH NATIONAL ROAD NO. 51 IN OLSZTYN

CONNECTION OF WILCZYŃSKIEGO STREET AND PŁOSKIEGO STREET WITH NATIONAL ROAD NO. 51 IN OLSZTYN

Investor: Olsztyn – City Hall Date: May 2014 – 15 December 2015 Task description: Task covers construction of road connection – prolonging Wilczyńskiego Street to Warszawska Street with connecting road system with Bukowskiego Street in Olsztyn together with junction of Bartąska and Bukowskiego Streets. It commences with connecting with National Road 51 in Olsztyn commune and ends atRead more about CONNECTION OF WILCZYŃSKIEGO STREET AND PŁOSKIEGO STREET WITH NATIONAL ROAD NO. 51 IN OLSZTYN[…]

CONCEPTION OF PASIECZNIK BYPASS – NATIONAL ROAD NO. 30

CONCEPTION OF PASIECZNIK BYPASS – NATIONAL ROAD NO. 30

Investor: General Directorate for National Roads and Motorways in Wroclaw Date: November 2005 – December 2008 Task description: Documentation covered elaboration of programme concept of national road of GP class with length of 4 km. Industries/Scope: roads -organization of substitution traffic, organization of target traffic, environment protection devices, water supply network, electrical grid, telecommunication network, green area project, geological-engineeringRead more about CONCEPTION OF PASIECZNIK BYPASS – NATIONAL ROAD NO. 30[…]

CONSTRUCTION OF FLOOD PROTECTION DEVICES

CONSTRUCTION OF FLOOD PROTECTION DEVICES

Full name: Construction of Objects/ Devices of Flood Protection Devices for conveyor channel Odra-Widawa and Widawa valley with reconstruction of road bridges and rail bridges under Modernization of Wrocław Water Node. Investor: Grontmij Polska, BPK Mosty S.C., Hydroprojekt Wrocław, Przedsiębiorstwo Projektowo – Wykonawcze Inżynierii Wodnej INWOD Date: July 2012 – September 2013 Task description: DocumentationRead more about CONSTRUCTION OF FLOOD PROTECTION DEVICES[…]

IMPROVEMENT OF THE TECHNICAL CONDITION OF THE PAVEMENT  OF KOSMONAUTÓW STREET

IMPROVEMENT OF THE TECHNICAL CONDITION OF THE PAVEMENT OF KOSMONAUTÓW STREET

Full name: Improvement of the technical condition of the pavement of Kosmonautów Street with creation of the paved hard shoulder and adjustment of the existing sidewalks for operating the foot and cycle traffic without any interchange (Motorway Ring Road of Wroclaw). Investor: Road and City Maintenance Management in Wroclaw Date: November 2010 – April 2011 Project description: The documentationRead more about IMPROVEMENT OF THE TECHNICAL CONDITION OF THE PAVEMENT OF KOSMONAUTÓW STREET[…]

RECONSTRUCTION OF THE TRAMWAY TRACK OF GRABISZYŃSKA STREET

RECONSTRUCTION OF THE TRAMWAY TRACK OF GRABISZYŃSKA STREET

Full name: task 1 – “Reconstruction of the tramway track of Grabiszyńska Street within the section from the “Grabiszyńska” tram terminal to km 0 + 230″ task 2 – “Construction of an approach road to Pomnik Wspólnej Pamięci”. Investor: PRO-TRA BUILDING Sp. z o.o. Date: March 2014 – August 2014 Project description: Reconstruction of theRead more about RECONSTRUCTION OF THE TRAMWAY TRACK OF GRABISZYŃSKA STREET[…]

DEVELOPMENT  OF PROJECT DOCUMENTATION FOR THE RECONSTRUCTION OF OSOBOWICKA STREET FROM THE ŚRÓDMIEJSKA BYPASS TO LIPSKA STREET IN WROCLAW

DEVELOPMENT OF PROJECT DOCUMENTATION FOR THE RECONSTRUCTION OF OSOBOWICKA STREET FROM THE ŚRÓDMIEJSKA BYPASS TO LIPSKA STREET IN WROCLAW

Investor/Contracting Authority: Road and City Maintenance Management in Wroclaw Project description: Development of design documentation for the reconstruction of Osobowicka St. from the Śródmiejska Bypass to Lipska St. in Wroclaw Date of development: 10 March 2008 – 30 December 2010 Scope/industry: roads, traffic organization, water supply, sewerage and gas networks, application for location decision, environmental decision, geological research, geodeticRead more about DEVELOPMENT OF PROJECT DOCUMENTATION FOR THE RECONSTRUCTION OF OSOBOWICKA STREET FROM THE ŚRÓDMIEJSKA BYPASS TO LIPSKA STREET IN WROCLAW[…]